The ADL Team has cooperated on this project with the main contractor, during the building phase. The proposed scheme of 7 new-build terraced properties has now been completed.
The construction proposed was in traditional cavity (block and bricks), with a block& beam ground floor and timber joists in the intermediate level.
The duration of the build was approximately 12 months, where the ADL team has conducted regular site visits and worked alongside the builders.